Site Preparation & Installation Responsibilities

Review access and model documents by dry, wet, refrigerated or heated route, then name the local work owners. A footprint alone omits delivery, collection and open-panel service space.

Site Preparation & Installation Responsibilities

Survey access and the operating footprint

Record the proposed machine location, delivery route, doorways, changes in level and space for positioning equipment. Include customer access, collection space and the clearance needed for replenishment and service panels. Operating and maintenance clearance is recorded for the proposed location, separately from the nominal cabinet footprint.

Packaging, Freight & Delivery Planning — Plan equipment packing, freight, receiving and delivery responsibilities using final shipment details and the proposed destination scope.

Footprint, collection and service opening

Footprint, collection and service openingAUser collectionBFootprintCServiceopening
  • A. User collection
  • B. Footprint
  • C. Service opening
A is the customer waiting and collection area. B is the available footprint. C is the door, panel and replenishment clearance. The delivery route is a separate survey item. Schematic, not to scale. No fixed dimension is shown.

Project review sequence

Project review sequenceSurvey access and theoperating footprintSeparate utility needs byequipment routeDefine the work boundaryAgree the handover checks
Survey access and the operating footprint

Separate utility needs by equipment route

Wet-area projects need an assessment of the relevant water, drainage and cleaning arrangements. Refrigerated equipment needs review of its documented environmental and ventilation conditions. Heated preparation introduces a different set of site and operating questions. Dry-product vending should be assessed on its own requirements. Do not apply one installation value across all categories.

Define the work boundary

List who provides site works, connections, positioning, fixing, commissioning and operator instruction. Distinguish the equipment scope from property management, local contractors and the site's operating team. Remote support should not be assumed to include local labour or permission to alter a building. Unresolved site questions should remain visible in the proposal.

Agree the handover checks

Identify the documents and observations needed to confirm that the agreed installation scope is complete. Include equipment identity, configuration, user sequence, routine maintenance access and the process for reporting outstanding items. Installation steps come from that machine’s installation drawing and the agreed scope. Share the site information through the project brief before requesting a final configuration offer.

Self-Service Machine Site Survey Checklist — Record site access, utilities, operator responsibilities and open installation questions in a self-service machine survey checklist.

Agree the support plan before ordering equipment — Define installation, routine maintenance, fault diagnosis, spare parts and escalation responsibilities for your self-service equipment project.

Frequently asked questions

Can the equipment footprint replace the maintenance clearance?

A footprint alone omits delivery, collection and open-panel service space. Operating and maintenance clearance is recorded for the proposed location, separately from the nominal cabinet footprint. The survey separates that footprint from the customer waiting and collection area and from the clearance to open a door, panel or replenishment point. An unknown measurement stays unresolved rather than becoming zero. The dimension comes from the drawing for the model being considered.

Does remote support include local labour?

Remote support should not be assumed to include local labour or permission to alter a building. The support plan identifies the remote support route and the tasks assigned to appropriately qualified local technicians. The service agreement identifies remote support, local labour and the party responsible for each task. Site works, connections, positioning, fixing, commissioning and operator instruction stay listed under the party who provides them.

How is arrival different from completed installation acceptance?

Receiving the shipment is distinct from completing installation or accepting all operating requirements. Installation is included when the delivery scope names it. Positioning, site connections, commissioning and local labour are listed separately from transport. The handover checks confirm that the agreed installation scope is complete, including equipment identity, configuration, the user sequence, routine maintenance access and any outstanding items. Those installation steps come from that machine's installation drawing and the agreed scope.

Related planning guides

  • Self-Service Machine Site Survey Checklist

    Survey input for this installation review: record the footprint, user collection, service opening, delivery route and utilities, and leave an unknown measurement open.

  • Packaging, Freight & Delivery Planning

    Delivery input before installation responsibility is split: use the final packing record and keep receiving separate from completed installation acceptance.