Equipment Procurement Resources

Use site surveys, factory acceptance checklists, payment verification records and a cost calculator to prepare an equipment discussion.

Prepare the project information first

Use procurement resources to organise the information needed for a model-specific discussion. Start with the operating task, country, proposed site, quantity plan and the people responsible for local operation. Distinguish facts already known from assumptions that still need to be checked.

A completed template is a project brief, not proof that equipment is available or suitable. Keep drawings, product lists and test results tied to their versions so a supplier can see which information a proposal is based on.

Prepare a site survey for your WhatsApp discussion

The site-survey checklist separates general access and utilities from the requirements of wet-area, refrigerated, heated-preparation and dry-product equipment. Mark a field as not applicable where appropriate; a packaged-goods project should not inherit a drainage requirement solely because another category uses water.

Share your site details directly in the WhatsApp conversation. Our team can discuss the next questions with you in the same conversation.

Use the released resources below

Resources are listed below when a reviewed version is available. Open the page to read the checklist or template and use its download link to obtain an editable text copy. Retain the version information with your completed project brief.

Do not put passwords, identity records or confidential customer data into a general procurement template. Begin an enquiry with a summary and arrange the exchange of necessary supporting material through the subsequent project discussion.

Keep decisions and evidence together

For each requirement, record the response, the evidence supporting it and the person responsible for the next action. Separate an unanswered question from an accepted exception. This makes it possible to compare revisions without silently changing the scope.

If your project needs a different checklist, describe the operating route and the decision you need to make in the project brief. A resource on this website does not replace model-specific documentation, site assessment or the applicable written agreement.

Procurement templates

Site survey checklist

Factory acceptance test checklist

Payment integration verification matrix

Chat on WhatsApp